The paperwork that decides whether your project happens

Between the decision to build and the first panel on the roof sit drawings, a structural assessment, a fire-safety design, a building authority and a distribution operator. We prepare all of it and carry it through, so the installation starts on a permit that holds.

Documentation drawn to what the building authority actually asks for

Structural and fire-safety assessments done before the roof is loaded

Connection contract and reserved capacity agreed with the distributor

What we prepare, and what each part is for

Building survey

We check the roof covering, the load-bearing structure, the switchboard and the existing wiring against the system you want to install, and against the building’s own documentation.

Project documentation

Technical drawings and written documentation in the form the building authority expects, so the file is accepted rather than returned for completion.

Building permit

We file the application, answer the authority’s queries and follow it through to a decision. You sign; we do the correspondence.

Connection contract

We agree the connection and the reserved capacity with the distribution operator. This is the step that most often decides how large a system you are allowed to build.

Structural assessment

A structural engineer confirms the roof or the ground structure can carry the array, including snow and wind loading, and names anything that has to be reinforced first.

Priced bill of quantities

A priced breakdown rather than a single number, so you can see what each part of the system costs and what changes if you scale it up or down.

Fire safety design

A fire-safety solution designed to the applicable standards, covering safe shutdown of the array and access for the fire service.

Subsidy application

We match the project to the grant scheme that fits it and prepare the application, built into the documentation from the start rather than bolted on afterwards.

Projects prepared this way

Each one started with drawings, a structural assessment and a connection contract.

Wagon Slovakia Košice

71.4 kWp and 229 kWh

Photovoltaics with 100 kW / 229 kWh of storage for a rail catering operator with more than 250 staff.

Research station, Gabčíkovo

125 kW and 1,305 kWh

A National Forest Centre site where a grid failure must not interrupt the measurements, so the backup design drove the whole file.

Why work with us?

Turnkey solution

We do not bolt together a catalogue of parts. We design the system around your site, build it, commission it and walk you through it before handover.

Engineers, not sales scripts

The people who assess your site understand the technology. They design the system around it and stay reachable after handover.

Verified suppliers

We only install components we trust and have tested ourselves, from established manufacturers.

Reliable service

We respond fast, replace faulty parts like for like and work directly with the manufacturer’s support team.

27+

countries we supply

3

EU warehouses

24/7

monitoring

12+

European markets we operate in

27+

countries we supply

24/7

monitoring

3

EU warehouses

12+

European markets we operate in

Most of this project can be part-funded

We have secured a grant for 99% of the applications we have submitted. It is worth knowing which scheme fits before the drawings are finished, because it changes what has to be in them.

How we work together

Proces zakázky

1.

Non-binding enquiry

Fill in the contact form, or e-mail or call us. Tell us what you have in mind and share your consumption or building data.

2.

Consultation

A technician visits the site, and together we settle what is to be built, where it goes and what the building can take.

3.

Project preparation

Our specialists will create detailed drawings and prepare all necessary documentation for building permits and other administrative steps.

4.

Permits and connection

We file with the building authority, answer its queries, and agree the connection and reserved capacity with the distribution operator.

5.

File handed over

You receive the complete set: drawings, structural and fire-safety assessments, the priced bill of quantities, the decision and the connection contract. Installation can start on it.

Frequently asked questions

It depends on the size of the system, where it sits and what the building is used for. We establish which route applies to your project before anything is drawn, because it changes both the documentation and the timeline.

Then the system is designed around the capacity you can actually get, and you hear what that costs you in output before you commit. Negotiating the connection is part of the work, not an afterthought.

A structural engineer. The assessment covers the array together with snow and wind loading, and it names anything that has to be reinforced before installation.

Yes. Send us what exists and we will tell you what is usable, what has to be redone, and where the file is most likely to fail.

Yes, and it is better that way. Grant schemes have documentation requirements of their own, and building them in from the start avoids redrawing later. See subsidies for companies.

A complete file: drawings, structural and fire-safety assessments, a priced bill of quantities, the building authority decision and the connection contract. Enough to start implementation.

Tell us about your site

We reply by the next working day

You receive our offer within a week

Prefer to talk it through? Call us.

We answer on weekdays from 8am to 4pm.

Ladislav Proc

Managing Director

What are you interested in? *
Select an option
Your monthly electricity bill
Select an option
Where is the site?
Fill out this field
Your name *
Fill out this field
Work e-mail *
Please enter a valid email address.
Phone (optional)
Fill out this field
Company
Fill out this field
You need to agree with the terms to proceed
Prefer to talk it through? Call us.

We answer on weekdays from 8am to 4pm.

Ladislav Proc

Managing Director

keyboard_arrow_up